SWMS software for tradies: a SWMS app your crew sign on their phones

Write a safe work method statement on your phone from a starter template, rate each step's risk, and have your crew read and sign it on site. Send the builder a link to the approved version, and keep every change as a new version.

A$12 or NZ$13 a month ex GST after the trial. Free during early access.
Example SWMS for roof work, with each step's risk rating before and after its controls, and the crew sign-on

SWMS

Approved

Your business name
For Example Builders

Job
J-1063
Version
3
Review by
30 Jan 2027

Re-roof, two-storey house

  • Falls over 2 m
  • Mobile plant
Step and controlsRisk
Set up edge protection and scaffoldTagged scaffold; guardrails to all edges EngineeringHigh → Medium
Strip and replace roof sheetsTool lanyards; exclusion zone below IsolateHigh → Low
Pack downTwo-person lifts AdministrativeMedium → Low

Worker sign-on

  • Sam K. ✓ signed
  • Jordan P. ✓ signed
  • Alex R. not signed yet

Example only. Starter templates are generic guidance to review, not legal advice.

From a blank page to a signed SWMS on site

Each SWMS lives on its job, so the right crew are asked to sign it.

  1. Step 1

    Start from a template, not a blank page

    On the job, open Safety and pick one of 8 SWMS starters, such as work at height (over 2 m), trench or excavation (over 1.5 m) and near energised electrical services, one of your own templates, or a blank form.

  2. Step 2

    Write the steps, hazards and controls

    Tick the high risk work it covers and add up to 20 steps, each with hazards, a risk rating from Low to Extreme, controls from the hierarchy of controls and the risk left after them.

  3. Step 3

    Add PPE, permits and the emergency plan

    Record the PPE, permits, licences and plans, and the emergency steps, with 000 in Australia or 111 in New Zealand.

  4. Step 4

    Name the builder and sign it off

    Add the principal contractor's name, ABN and contact details, printed next to yours. Then sign it as the preparer and approve the version on screen.

  5. Step 5

    Crew read and sign on their phone

    Crew on the job see a banner on their week until they sign. Each ticks that they've read and understood it and signs with a finger, or you pass your phone around.

  6. Step 6

    Share it with the builder and keep it current

    Email the builder a read-only link to the latest approved version, with who's signed on, and turn links off any time. Each change makes a new version for crew to sign.

More than a SWMS template

Version history
Every version is kept with its reason, a list of what changed and its own signatures.
Review dates
Set a next review date and a Review due chip shows 14 days before it, then Overdue.
Your own templates
Save any form as a template, so your usual roof job SWMS is ready for the next one.
Job hazard analyses, pre-starts and incidents
Job hazard analyses, pre-start and toolbox talk checklists, and incident or near-miss reports with photos.
Print or save as PDF
Print any form or save it as a PDF, with a paper sign-on sheet for anyone still to sign.

Good to know

  • Starter templates are generic guidance, not legal advice. Review and change them to suit your work, site and people before use.
  • There are 8 SWMS starters, not one for every high risk activity.
  • Signing happens in the phone's browser, so it needs a signal.
  • New Zealand accounts call it a safety plan, and its high risk work list follows the Australian categories as a prompt.

Not sure if your work needs a SWMS? Safe Work Australia lists the high risk construction work that does: High risk construction work requiring a SWMS (Safe Work Australia).

Trades that write a SWMS before they start

SWMS matter most where the work itself is high risk:

Builders
A SWMS for each high risk stage, signed by everyone on site.
Electricians
Work near energised installations, from the electrical starter.
Roofers
Roof work with a fall of more than 2 metres.
Plumbers
Trenches deeper than 1.5 metres, signed before the dig starts.
Metal fabricators
Installs from an elevated work platform, with mobile plant nearby.
Demolition
Load-bearing walls, with asbestos checked before anything comes down.

See all 80 trades we support

What it costs

Solo is A$12 (NZ$13) a month ex GST for one person. Crew is A$22 (NZ$24) for up to five. See full pricing.

Questions about SWMS software

When do I need a SWMS?

Under the model work health and safety laws, for high risk construction work, such as where someone could fall more than 2 metres, a trench deeper than 1.5 metres or work near energised electrical services. Rules vary by state and territory, so check with your WHS regulator.

Can my crew sign the SWMS on their phones?

Yes. On the Crew plan each person has their own login, sees what's waiting for their signature and signs with a finger. On Solo, pass your phone to each person.

Can I send the SWMS to the builder?

Yes. Once it's approved, email it or create a read-only link. The builder sees the latest approved version and who's signed on, and you can turn links off at any time.

Are the SWMS templates compliant?

They're generic starting points, not legal advice, and the app doesn't check compliance. Change each one to suit your work, site and people, then save it as your own template.

Every feature, and what's coming soon · Pricing · All 80 trades

Run the business side in minutes a day

30 days free. No card. Set up in under a minute.

Start your free trial